上司的妻子免费观看正版电视剧,亚洲熟妇丰满多毛XXXX,亚洲色偷偷综合亚洲av78,亚洲人成无码网站在线观看野花

上海金泰工程機(jī)械有限公司
上海安亭洛浦路45號(hào) 400-820-8326

NEWS

Jintai machine constructed in Egypt

2009-11-10

    The second stage project of Said port Egypt is located in the north of Suez Canal. This project is to make a dock with the square piles in the middle part and T type piles in the circumjacent part. The dock will be the berth for 4 Panama super-type container ships. This project is the key project in Egypt.


 


    We have 7 sets of Jintai machines constructed in Said port as the main force, including 3 sets of SG40A, 1 set of SG35A, 2 sets of SD28W rotary drill and 1 set of SMW ZKD85-3.
The stratum condition: 0-13m sand layer, 13-15m fill-back layer, 15-45m soil layer, 45-57m fine sand layer.


 


    JINTAI machines are praised by the user and Egypt supervisor with good performance.